PSE&G completed their repairs around 12:30PM today, and utility power was restored shortly after. After verifying the stability of the power, we switched back to utility power around 1:30PM. All power infrastructure continues to operate normally.
PSE&G completed their repairs around 12:30PM today, and utility power was restored shortly after. After verifying the stability of the power, we switched back to utility power around 1:30PM. All power infrastructure continues to operate normally.